Structured Cabling — Copper & Fiber
CAT6/6A copper and fiber runs executed to spec — signal-certified, labeled, and fully documented at handover. From network comms rooms to hyperscale data halls.
Request a Site Walk →
Performance Targets
Scope of Work
- ✓Site survey and pathway design; permitting support
- ✓CAT6/6A copper runs and terminations
- ✓Single-mode and multi-mode fiber pulls, field-terminated and fusion-spliced where required
- ✓Fiber tested with OTDR and power meter per approved scope; copper certified with Fluke DSX or equivalent; labeling to owner-approved ANSI/TIA-606 schema
- ✓Rack dressing and documentation; freezer/cooler and high-bay experience
- ✓Test reports, label schema, as-builts, and closeout pack
Deliverables
See It in the Field
RACK & STACKUnited States
Telecom Transport Lab Build-Out
- ›Delivered in 2 Weeks
- ›DWDM · MPLS · Microwave Transport
- ›4 Platforms · 6 Racks Commissioned
Structured Cabling — FAQ
Do you work as a subcontractor for IT integrators and general contractors?
Yes — the majority of AES engagements are as a subcontract execution partner to prime contractors, systems integrators, and managed service providers. We bring our own supervision, documentation standards, and closeout deliverables to every engagement.
What certifications and documentation do you deliver at project closeout?
Per approved scope, AES delivers OTDR trace files and power meter results on fiber runs, link certification reports from a Fluke DSX or equivalent field tester on copper, labeling records aligned with the ANSI/TIA-606 (or owner-approved) schema, and full as-built documentation. The complete closeout pack is delivered at handover — not chased after.
What cable categories and fiber types does AES install?
We install CAT6, CAT6A (U/UTP and F/UTP shielded), and OS2, OM3, and OM4 fiber. Fiber runs are field-terminated or fusion-spliced depending on the design requirement. We also work in freezer, cooler, and high-bay environments.
How long does a structured cabling project typically take?
A typical network comms room with 100–200 runs can be completed in 2–5 days. Larger multi-floor or multi-site deployments are scoped individually with milestone timelines. We provide daily progress updates throughout.
Cabling runs don't wait. Neither do we.
Send us the details and we'll respond within one business day with a clear path forward.