Rack & Stack — Data Center Build & Refresh

Bare room to live racks, executed clean. AES handles the full build — planning through validated handover — so your PM doesn't have to chase it.

Request a Site Walk →
Rack and stack data center installation

Performance Targets

Every rack validated and punch-listed before handover
CMDB-ready asset inventory delivered at closeout
Burn-in support executed on-site where required
Daily progress reports — no chasing required
Request a Site Walk →

Scope of Work

  • Pre-build planning: rack layout, power mapping, cable management design
  • Physical rack installation, anchoring, and leveling
  • Server, switch, and appliance mounting per vendor and client standards
  • Power distribution unit (PDU) install and circuit labeling
  • Cable management: structured patch, power, fiber — labeled to ANSI/TIA-606 or owner-approved schema
  • BIOS/firmware validation and burn-in support
  • Asset tagging, CMDB (IT asset database) updates, and closeout documentation
  • Smart hands for hardware refresh, swap, and decommission

Deliverables

Rack DiagramsCable LabelsBurn-In ReportsAsset InventoryCloseout Pack

See It in the Field

Telecom Transport Lab Build-Out
RACK & STACK

United States

Telecom Transport Lab Build-Out

  • Delivered in 2 Weeks
  • DWDM · MPLS · Microwave Transport
  • 4 Platforms · 6 Racks Commissioned
Read Case Study →

Rack & Stack — FAQ

What does rack and stack include in a data center deployment?

AES rack and stack services cover physical rack installation and anchoring, server and appliance mounting per vendor specs, PDU installation and circuit labeling, structured cabling and power dressing within the rack, asset tagging, and full closeout documentation. We work from your BOMs and rack elevation drawings.

Do you provide burn-in and validation after rack and stack?

Yes. AES can perform burn-in monitoring, BIOS/firmware validation, IPMI/BMC verification, and pre-handover punch-list clearance where required. Burn-in scope and duration are confirmed during project planning.

Can AES handle multi-site rack and stack rollouts simultaneously?

Yes. We staff and coordinate multi-site deployments across U.S. and Canadian markets simultaneously using a network of vetted field resources. Multi-site rollouts include unified documentation, standardized labeling, and a single closeout pack per site.

What documentation is delivered at rack and stack handover?

Handover documentation includes rack elevation as-builts, cable labeling logs, equipment serial number records, PDU load documentation, burn-in test reports, and a signed punch-list clearance. CMDB-ready asset inventory is also provided.