Apex Enterprise Solutions

Wireless & Low-Voltage for High-Throughput Warehouses

AP rollouts, structured cabling, and freezer/cooler-rated installs — scheduled around active operations to minimize disruption to throughput.

Get a Quote →

The Problems AES Is Built to Solve

Operations Cannot Stop for Infrastructure

Picking floors run 24/7. AP installs, cable pulls, and cutover windows must be planned around live shifts — not the other way around. AES specializes in change-window discipline.

High Ceilings and Steel Kill Signal

40-foot clear-heights, steel mezzanines, dense racking, and forklift traffic create RF environments that generic AP placement will not solve. On-site surveys and validation heatmaps are standard.

Cold Storage Needs Different Materials

Freezer and cooler-rated cable, conduit, and mounting hardware are required in temperature-controlled zones. AES sources and installs to spec — no shortcuts that fail in six months.

Scale Means Coordination, Not Just Techs

Multi-site, multi-IDF programs require daily field updates, pre-staged equipment, and crew rotations. A single technician with a ladder is not a program — AES runs programs.

1,586+
APs Replaced Across a Documented Multi-Site Program
46
IDFs Across 2 Sites
0
Recorded Safety Incidents · Documented AES-Led Engagements

Services for Logistics & Warehousing

Structured Cabling

Copper & Fiber

Copper & fiber installed, tested, labeled, and documented to approved scope.

Learn More →

AP Refresh

Large-Scale Wireless Rollouts

High-density Wi-Fi deployments for steel, concrete, and cold-storage environments.

Learn More →

A Recent Deployment in This Space

Large-Scale AP Refresh — Ontario Fulfillment Centres
AP REFRESH

Scarborough & Bolton, ON

Large-Scale AP Refresh — Ontario Fulfillment Centres

  • 1,586+ Access Points Replaced
  • 2 Sites · 46 IDFs
  • 24hr Shutdown Window · 0 Recorded Safety Incidents
Read Case Study →

Logistics & Warehousing — FAQ

Can AES execute multi-site warehouse AP refresh in active 24/7 operations?

Yes. AES regularly executes multi-site, multi-IDF AP refresh programs across active picking floors — scheduling around live shifts, coordinating with site operations teams, and running daily field updates. The documented Q1 2026 Ontario program covered 1,586+ APs across two fulfillment centres without disrupting throughput.

Does AES handle freezer and cooler-rated installations?

Yes. Cold-chain logistics work requires freezer / cooler-rated cable, mounting hardware, AP enclosures, and crew PPE. AES sources and installs to spec — no shortcuts that fail when the temperature drops.

How does AES coordinate field crews across multi-site rollouts?

AES runs program-level coordination, not single-truck dispatch: pre-staged equipment, pre-labelled hardware where feasible, daily field reports, real-time per-AP tracking, and clean shift hand-offs. Your PM gets visibility into every site every day, not just at closeout.

Have scope? AES will execute it.

Send us the details and we'll respond within one business day with a clear path forward.