Project Examples & Field Quality Controls

What a prime contractor or systems integrator should be able to verify before awarding structured cabling, data center or multi-site wireless work.

Request Evidence for Your Scope →

Published execution examples

The examples below link to AES-published project accounts. They illustrate scope, coordination and project delivery; they are not independent audit findings, customer endorsements or public copies of acceptance records.

Client names, drawings, test files and site photos may be restricted by confidentiality obligations. We do not publish them without the required permission.

AES case study

GPU-dense data center | Memphis, TN

Structured fiber routing, cable management and rack-and-stack across multiple deployment phases.

AES's published project account describes mobilization of a 6–7 person fiber and hardware crew.

Read the data center example →

AES case study

Telecom transport lab | United States

Site audit, installation documentation, telecom platforms and equipment integration across six racks.

AES's published account describes a two-week build and as-built handover.

Read the telecom example →

AES case study

Warehouse AP refresh | Ontario, Canada

Two fulfillment facilities, 46 IDFs, pre-staging, lift-safety coordination and per-device tracking.

The AES-published case study reports 1,586+ AP replacements, including a 24-hour window at one site.

Read the Ontario example →

AES case study

Warehouse AP refresh | United States

Physical AP replacement support, mounting and labeling in a live logistics environment.

The AES-published project account reports an 850-AP deployment through an implementation partner.

Read the U.S. example →

Historical Canadian project examples do not imply AES currently self-performs in Canada. Current Canadian delivery is coordinated through partners.

A documented quality process, not an unsupported certification claim

AES maintains a controlled Quality Control Program (AES-QMS-QCP-001, Rev. 5.0, October 2026). Its framework covers progressive inspections, instrument-based testing, nonconformance control, subcontractor oversight and closeout. The executed contract, approved drawings and customer specifications determine the actual requirements for each project.

This internal quality program is not a third-party ISO, BICSI or other certification. Project-specific implementation and acceptance must be evidenced separately.

01 | Plan and qualify

Confirm the approved scope, drawings, access conditions, approved materials, safety requirements, test limits and who will sign off.

02 | Inspect during installation

Check routing, support, bend radius, connectors, labeling, racks and equipment against the client's specifications, with first-article checks when justified.

03 | Test to the contract

Record required copper certification, fiber OLTS/OTDR, continuity/polarity or device verification results using the specified methods and acceptance criteria.

04 | Close the evidence loop

Resolve punch items, retain required test files and photos, reconcile labels and asset records, and submit the project-specific turnover package.

What to request in a bid or qualification review

  • An approved statement of work and a clear responsibility matrix
  • An inspection/test plan tied to project-specific acceptance criteria
  • Sample redacted instrument-generated results, when available and releasable
  • Cable/port or AP-by-AP tracking records matched to asset IDs
  • As-builts, punch-list disposition and customer acceptance records, where authorized
  • Site-specific supervision, safety and partner qualification documentation

These are qualification and closeout evidence categories—not a claim that every listed artifact has been produced or can be disclosed for every past project.

Need a project-specific evidence review?

Send your site list, scope and acceptance requirements. AES can confirm delivery fit, relevant qualifications and what supporting examples can be shared under the right permissions.

Send Your Scope →

Where regulated construction or electrical work applies, the contracting and licensing responsibilities must be established for that jurisdiction before work begins.

Project evidence should match the scope, not a marketing claim.